Dropped off “The Brown” at the airport and took the long way to work on Friday.
Side note trivia: Estimated cost of this tower is $30,000,000.
Dropped off “The Brown” at the airport and took the long way to work on Friday.
Side note trivia: Estimated cost of this tower is $30,000,000.